Maintenance plans for housing cooperatives: make one you actually use

A maintenance plan has been a legal requirement for Swedish housing cooperatives since 2024. How to build one the board can use for budgets, fees and procurement - not a binder on a shelf.

Updated

Apartment building in Gothenburg with its façade under maintenance

Since 1 January 2024, every Swedish housing cooperative (bostadsrättsförening, BRF) must have a maintenance plan covering at least 50 years ahead, and it must be kept up to date. Most cooperatives now have a plan. Far fewer actually use it.

The difference between a plan that sits in a binder and a plan that steers the organisation has less to do with the quality of the plan and more to do with how the board works with it.

What the law actually requires

The requirement is in the Swedish Housing Cooperatives Act (bostadsrättslagen) and in short means:

  • The plan must cover at least 50 years
  • It must describe the cooperative's future maintenance needs
  • It must be kept up to date – in practice reviewed every year and updated in depth every three to five years
  • In the directors' report of the annual accounts, the board must explain how maintenance is being planned

The law says nothing, however, about what format the plan should take or who should draw it up. That is up to the cooperative.

What a useful plan contains

A plan that just lists "façade – 2038" helps no one. Every item needs four things:

  1. The building component and its condition today – not just "roof" but "concrete tiles from 1987, moss-covered, underlay felt assessed as worn out"
  2. The year of action as a range – "2029–2032" is more honest than "2030"
  3. Estimated cost in today's money – with the uncertainty stated
  4. The consequence of postponing – what happens if the work is done five years later?

Point four is what turns the plan into a basis for decisions. A roof that is postponed by five years can mean moisture damage in the roof boarding and a cost that doubles. A playground that is postponed by five years means nothing at all. Without that information the board is prioritising blind.

A maintenance plan without a description of consequences is a shopping list, not a plan.

Typical intervals to plan for

Building component Normal interval Comment
Roof, concrete tiles 40–50 years The underlay felt decides, not the tiles
Rendered façade 30–40 years Cracking increases sharply towards the end
Windows, timber 40–50 years Repainting every 8–12 years in between
Water and drain stacks 50–60 years Relining can add 20–30 years
Balconies, concrete 40–50 years Corrosion of the reinforcement is the critical factor
Lifts 25–30 years Modernisation often comes before full replacement
Ventilation, heat recovery (FTX) 25–30 years Mandatory ventilation inspection (OVK) every 3–6 years regardless
Painting stairwells 12–18 years Driven by wear, not age

The intervals are starting points. Actual condition, location and previous maintenance carry more weight than age. A west-facing building near the coast ages faster than the same building in a sheltered spot.

From plan to budget

This is where most cooperatives fall down. The plan says the façade will cost SEK 6 million in twelve years, but the fee is set based on last year's costs.

Do this instead:

1. Add up the 50-year plan and work out the annual need

Total planned cost divided by the number of years gives the cooperative's average annual maintenance need. Compare it with what you actually set aside today. For many cooperatives the gap is uncomfortably large – and that insight is exactly what the plan is for.

2. Put the next ten years into a cash-flow forecast

The 50-year figure is for planning. The ten-year figure is for decisions. This is where you see whether two large items fall in the same year and need to be spread out.

3. Decide on financing for each major item

Own funds, loans or a fee increase – make the decision in advance, not when the procurement is already under way.

4. Update the plan after every completed measure

A new roof resets that item and pushes the next action further into the future. If this is not done, the plan is wrong after the very first project.

Five mistakes we often see

  • The plan is bought once and never touched again. After three years neither the prices nor the condition assessments are right.
  • Nobody on the board owns the plan. Appoint one responsible board member, not "the board".
  • Measures are bundled into the same year because it looks tidy in the table. Reality and cash flow say otherwise.
  • Emergency maintenance is never booked back into the plan. Then you lose traceability.
  • The plan is not used in procurement. Knowing that the façade is due in three years gives you a completely different negotiating position when the scaffolding is already up for the window replacement.

Coordination is the easiest saving

Scaffolding, site set-up and waste removal are fixed costs paid per occasion, not per measure. Putting window painting, façade repairs and sheet-metal work in the same period can cut the total cost by tens of per cent compared with three separate projects.

That is also why the plan should have ranges and not exact years – the margin is what makes coordination possible.

An annual cycle for the board

  • January–February: compare last year's outcome with the plan
  • March–April: visual inspection of the property, update condition assessments
  • May–June: revise the ten-year forecast ahead of the budget work
  • September–October: budget and any fee adjustment
  • November: plan winter emergency readiness and next year's procurements

Need help with maintenance?

Byggentra AB works with housing cooperatives in Kållered, Mölndal, Gothenburg and the rest of Greater Gothenburg – both on ongoing service agreements and on individual projects such as roofing, façades, plumbing and electrical work. We are happy to help with condition assessments ahead of a revision of your plan.